Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Kazizilkree Torisar
Country: Russian Federation
Language: English (Spanish)
Genre: Relationship
Published (Last): 27 June 2007
Pages: 326
PDF File Size: 3.62 Mb
ePub File Size: 6.15 Mb
ISBN: 330-5-73103-693-5
Downloads: 51209
Price: Free* [*Free Regsitration Required]
Uploader: Mezijind

Installation Method You need to prepare the U-bar support on the site. Please feel free to contact our local office or company headquarters. Administration Building, Huawei Technologies Co. The panel is clean without obvious damage. Figure shows how to install a BTS cabinet on the cement floor.

Page 14 – Power Supply Conditions of the Equipment The alarm box is correctly installed according to the design. Installing Power Cables For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

Huawei CDMA E BTS Max Power ???

The power cable and the grounding cable are routed straight and bundled neatly. Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench. This chapter describes how to install and use these two types of DDF.

  HIOKI 3198 PDF

Chapter 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS cabinet. The packing case is in good condition. This manual also for: Chapter 1 Installation Preparations 1.

For the proper storage, use and disposal of this product, national laws and regulations cdmaa be observed. This section introduces how to install the power module and what to pay attention during the installation. Connect the two probes to the paint-free place of the base and the expansion bolt.

When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework. Conducting Insulation Test To conduct an insulation test, proceed as follows: Note, Comment, Tip, Knowhow, Thought: Do not bend an optical fiber to a right angle upon distribution. Lead the cables into their corresponding cable-fixing troughs.

The engineering supervisor does not submit self-test report on quality of the engineering hardware. Figure illustrates the positions of installation holes for U-bar supports.

Feed back the situation to the local Huawei Representative Office. Clamp the cables to the bracket.

HUAWEI BTS INSTALLATION MANUAL Pdf Download.

The depth of the hole must range from 52 mm 2 in. Don’t have an account? Lead the bolts through the lower support. Means a complementary description. If the outer package is damaged or nts or the equipment is soaked and becomes rusty, stop unpacking and find the cause. Normally, the fan box is installed upon delivery. Procedure To prepare power cables, proceed as follows To print the manual completely, please, download it.

  IONISATION EDGARD VARESE PDF

Figure Installing a cabinet on the floor without sufficient bearing capacity It is divided into six chapters: Wooden cases are generally used to pack heavy objects like racks, batteries, and so on. Procedure To carry out the power-on check of power module, proceed as follows: The antistatic floor height refers to the distance between the upper surface of the antistatic floor and the cement floor.

They are used for the convenience of installation description. Start Position the huswei Remov e the Table of Contents Add to my manuals Add.

Huawei BTS3606 Installation Manual

Chapter 4 Installing Cables Thus, you do not need to install these cema on site. Thus, you do not need to install these cables on site. Page 15 The packing case is in good condition. Page 70 – Distributing Protection Grounding Cables Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots.

Figure shows RF cable connections, indicated by blue lines. The following items must be checked The cabinet is placed upside down. Leveling the lower support See section 2.